ASPHALT PAVING, REPAIR AND SEALCOATING
What people say about us is more important than what we say about us. The following comments tell the story.
Loewen paved many sections at our commercial site in Abbotsford at United Concrete. Every time I need them it has to happen on the weekend and they are always very accommodating. The end result is always what I expected. I would recommend this company to anyone.
Matt Hoekstra,
Industial Plant Manager
Excellent work! Sebastian and his team did an amazing job. It was a fairly large job, and he made sure that everything was done properly and didn't cut corners. If your looking for superior workmanship, these are your guys.
Christina Zamniuk,
Business Owner
I had a 60' by 40' area to be paved over eroded concrete and sloped better. It had 2 areas where the concrete had eroded and sunk with dips as much as 3". When it rained after paving there was no more than 2 gallons worth of water standing on the entire area. They aced it!
Gary De Geus,
Farm Owner
We had a large concrete driveway with cracks and dents.This awesome team did an excellent job and on budget. They were very well organized, worked efficient and cleaned up after finishing the job. I would highly recommend this company.
WH S.,
Via Google
Our experience with Loewen Paving was excellent. Early in May we hired the company to pave our long, 400 foot driveway which winds up a hill in Ryder Lake. They did a beautiful job, meeting and exceeding our expectations. Sean Prest, the gentlemen from whom we got the quote and negotiated with, was most straight forward, honest and did the job exactly as he promised. (sometimes a rarity in today's market) We highly recommend this company and their quality workmanship. We have had many positive comments on how great our driveway looks ...it definitely adds value to our property.
Patrick V
Via Better Business Bureau
I want to thank you for the great job that was done today at our KMS Tools Chilliwack store. What a great crew, friendly and professional. The job was done quickly and was exactly what we wanted. I will recommend your company to any one who asks. Looks great!
Terry Allin,
Via Google
Frequently-Asked Questions
Vivamus mi urna, malesuada ac felis quis, consequat hendrerit augue. Ut vulputate sem faucibus justo finibus hendrerit
When paving material is first laid down, it has to be compacted (steamrolled). That's why, when you are told you are getting 2 1/2 inches, you need to know if that's 2 1/2 inches BEFORE or AFTER it gets squashed down to 1 inch, which often isn't enough. Ask your estimator. The answer you get should be AFTER compaction.
The same rules apply for almost every industry. There are paving outfits that roam around, promising cheap paving. They can get their prices down low by cutting corners. Using less material, not clarifying what "After Compaction" really means, paying their employees less money and using older equipment. The results aren't always what their clients pay for, but the results may only be discovered after a long, wet winter.
Everybody loves to save a buck, but when it ends up costing more in repairs or redo's later, it isn't much fun anymore.
These are a few questions to ask, and points to raise:
One of the most important parts of your new asphalt surface is actually the sub base.
The sub base provides a stable surface to support new pavement.
The sub base is a frost barrier to help reduce winter damage due to freezing and thawing.
During the installation, base thickness, base stability and compaction are important steps.
If the sub base is not appropriately compacted, the asphalt surface on top will not provide the years of durability you think you're buying
Full-depth asphalt driveways are built entirely of asphalt paving mixture - from the soil subgrade up.
Full-depth driveways keep water out of the pavement, so water never enters the pavement to swell when it freezes.
Full-depth asphalt provides a better balance of strength and flexibility - plus durability - than any other material.
For improved soil stability, it is recommended that topsoil containing clay be removed or modified. Soil stabilization or as much as 6 inches of crushed aggregate base may be required for some subgrade conditions.
Both the subgrade and aggregate base require thorough compaction to provide a solid foundation for your new driveway.
Once the site is ready, paving with asphalt follows. In many cases a 4-inch thickness may be adequate, but 5 or even 6 inches of full-depth asphalt will assure you of a stronger, stable driveway under a wider range of climate and loads.
As an option, some contractors use 6 to 8 inches of compacted aggregate, or gravel, as a base for 3 inches of asphalt pavement.
'Bumps' in asphalt concrete overlays can be extremely frustrating when they happen.
With more focus on ride quality and pavement smoothness, paving contractors, asphalt concrete providers, paver manufacturers, and roller manufacturers, engineering firms and agencies have all researched ways to assure a smooth finished overlay.
Pavement design, field conditions, paving and compaction equipment and general construction practices are all suspect and have been cited as factors for bumps in overlays.
One construction practice that is in control of the contractor is compaction of the overlay. In the process of overlay compaction, the rollers tend to shove the mix forward.
If this happens on a job where the original pavement has 'uniform restraining characteristics, a smooth finished surface can be achieved.
However, if this original underlying pavement surface varies significantly due to irregularities or conflicting materials, uneven shoving can result in unwanted bumps.